logo
ProjectClosed

Lime Creek Trail Replacement

Closed · Idaho · Last reported Aug 2024

Source: Dodge USA

The work shall consist of but is not limited to mobilization, soil erosion & pollution control, removal and disposal of an existing unserviceable trail bridge, rip rap armoring of new bridge abutments using local in-situ rock, design, purchase, transport, and installation of a prefabricated steel trail bridge, design, purchase, transport, and installation of new substructure (pre-cast concrete gra

Status
Closed
Sector
Steel, Cement, Car parking, Bridge, Mass Transit, Automotive, Rail, Metal, Commercial
Location
Boise, Idaho, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Lime Creek Trail Replacement

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lime Creek Trail Replacement” is an infrastructure initiative in the Steel sector, located in Boise, Idaho, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The work shall consist of but is not limited to mobilization, soil erosion & pollution control, removal and disposal of an existing unserviceable trail bridge, rip rap armoring of new bridge abutments using local in-situ rock, design, purchase, transport, and installation of a prefabricated steel trail bridge, design, purchase, transport, and installation of new substructure (pre-cast concrete grade beams), construction of approach embankments, and general cleanup. This is a remote site not a...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Idaho

City

Boise

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Steel, Cement, Car parking, Bridge, Mass Transit, Automotive, Rail, Metal, Commercial

Article published date

2024-08-19

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project