logo

Lime Down Solar Park

Sector: Energy Storage • Location: Malmesbury, Wiltshire, United Kingdom

Source: Wilts and Gloucestershire Standard

Project
Planned

A proposed 50MW+ solar farm across five sites in Wiltshire, featuring solar panels, inverters, substations, and a battery energy storage system at one site. The project includes local grid connections, temporary and permanent access roads, and will link to the National Grid at an existing substation in Melksham through underground cables.

Status
Prospective
Sector
Energy Storage, Raw Materials, Road, Solar, Power Generation (CCGT)
Location
Malmesbury, Wiltshire, United Kingdom
Updated
22 Jul 2026
Source
Wilts and Gloucestershire Standard

ConstructChat

Ask ConstructChat about Lime Down Solar Park

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Lime Down Solar Park” is an infrastructure initiative in the Energy Storage sector, located in Malmesbury, Wiltshire, United Kingdom. Taiyo aggregates data on it from Wilts and Gloucestershire Standard.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed 50MW+ solar farm across five sites in Wiltshire, featuring solar panels, inverters, substations, and a battery energy storage system at one site. The project includes local grid connections, temporary and permanent access roads, and will link to the National Grid at an existing substation in Melksham through underground cables.

Original sector

Energy

Location

Country

United Kingdom (UK)

State

Wiltshire

City

Malmesbury

Source

Source

Wilts and Gloucestershire Standard

URL

More Details

Record type

Project

Sector

Energy Storage, Raw Materials, Road, Solar, Power Generation (CCGT)

Article published date

2025-11-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project