Limestone CIC Cable Replacement Project
Closed · California · Last reported Jan 2025
Source: Dodge
The replacement of obsolete CIC (Cable-in-Conduit) type construction with new reliable XLPE cable and conduits. The project will include trenching, conduit installation, and paving along Limestone Dr. and adjacent streets surrounded by Don Derr Park, Monroe St., Lincoln Ave. and Adams St., in the Presidential Park neighborhood of the City.
- Status
- Closed
- Sector
- Telecommunications, Government, Road, Commercial, Car parking, Automotive, Manufacturing (Industrial)
- Location
- Riverside, California, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Limestone CIC Cable Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The replacement of obsolete CIC (Cable-in-Conduit) type construction with new reliable XLPE cable and conduits. The project will include trenching, conduit installation, and paving along Limestone Dr. and adjacent streets surrounded by Don Derr Park, Monroe St., Lincoln Ave. and Adams St., in the Presidential Park neighborhood of the City. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | California |
City | Riverside |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Telecommunications, Government, Road, Commercial, Car parking, Automotive, Manufacturing (Industrial) |
Article published date | 2025-02-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Telecommunications projects in United States of America
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- PAULDING COUNTY ITS SYSTEM EXPANSION - PHASE II
- UPGRADE (E) WIRELESS TELECOMMUNICATIONS FACILITY.ADD 2 ANTENNAS ADD 3 RRU'S ADD 1 OVP SURGE PROTECTOR ADD 1 HYBRID
- INSTALLATION OF A NEW SMALL CELL WIRELESS FACILITY IN THE PUBLIC RIGHT OF WAY
- REMOVE AND REPLACE NEW WIRELESS ANTENNAS AND RELATED EQUIPMENT
- INSTALL 1 FLAGPOLE,6 ANTENNAS,1 RADOME,3 POWER CABLES,3 HYBR D CABLES,JUMPERS FROM RRUS TO ANTENNAS,NEW 10'X10'LEASE..SEE
- DISH WIRELESS COLLOCATION ONTO EXISTING WIRELESS FACILITY AND GROUND BASE STATION
- COLLOCATION OF (3)NEW ANTENNAS & ASSOCIATED CABLES & EQUIPMT PER ATTACHED SCOPE OF WORK. 6904 COMPLIANT AT&T (E)CELL SITE
