Limestone Ridge Reliability Project
The owner, status and timeline of this project. A free account opens every field.
Source: Burns & McDonnell
The Limestone Ridge Reliability Project aimed to enhance electric reliability in southeast Missouri through the construction of new and rebuilt transmission lines, two new substations, and an update to an existing substation. The project was completed safely, on schedule, and within budget, allowing Wabash Valley Power Alliance to improve its power delivery capabilities.
- Status
- Closed
- Sector
- Manufacturing (Industrial), Power Generation (CCGT)
- Location
- Wittenberg, Missouri, United States of America
- Updated
- 22 Jul 2026
- Source
- Burns & McDonnell
ConstructChat
Ask ConstructChat about Limestone Ridge Reliability Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Limestone Ridge Reliability Project aimed to enhance electric reliability in southeast Missouri through the construction of new and rebuilt transmission lines, two new substations, and an update to an existing substation. The project was completed safely, on schedule, and within budget, allowing Wabash Valley Power Alliance to improve its power delivery capabilities. |
Original sector | Power |
Location
Country | United States of America (USA) |
State | Missouri |
City | Wittenberg |
Source
Source | Burns & McDonnell |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Power Generation (CCGT) |
Article published date | 2025-03-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
