Limondale 8-hour Battery Energy Storage System
The owner, status and timeline of this project. A free account opens every field.
Source: pv magazine Australia
The Limondale Battery Energy Storage System (BESS) is Australia's first 8-hour battery energy storage system with a capacity of 50 MW / 400 MWh. It utilizes 144 Tesla Megapacks and is located adjacent to the 314 MW RWE Limondale solar farm in New South Wales. The project enhances grid stability, supports secure energy supply, and enables efficient use of renewable energy.
- Status
- Under Construction
- Sector
- Energy Storage, Solar, Raw Materials
- Location
- Balranald, New South Wales, Australia
- Updated
- 22 Jul 2026
- Source
- pv magazine Australia
ConstructChat
Ask ConstructChat about Limondale 8-hour Battery Energy Storage System
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | operational |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Limondale Battery Energy Storage System (BESS) is Australia's first 8-hour battery energy storage system with a capacity of 50 MW / 400 MWh. It utilizes 144 Tesla Megapacks and is located adjacent to the 314 MW RWE Limondale solar farm in New South Wales. The project enhances grid stability, supports secure energy supply, and enables efficient use of renewable energy. |
Original sector | Energy |
Location
Country | Australia |
State | New South Wales |
City | Balranald |
Source
Source | pv magazine Australia |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Solar, Raw Materials |
Article published date | 2026-05-31 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
