Lincoln CC Main Water Line Replacement
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Project will consist of extending an 8 water main 815 LF along Roper Drive to the existing Adult Correctional Facility. Instillation of a new fire hydrant at the end of the line and two new service connections including backflow and meters.
- Status
- Closed
- Sector
- Water Supply and Storage, Government, Commercial, Waste Processing and Treatment
- Location
- Lincolnton, North Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lincoln CC Main Water Line Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Project will consist of extending an 8 water main 815 LF along Roper Drive to the existing Adult Correctional Facility. Instillation of a new fire hydrant at the end of the line and two new service connections including backflow and meters. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | North Carolina |
City | Lincolnton |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Government, Commercial, Waste Processing and Treatment |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
