Lincoln Co - Huntsville Hwy Water Line Replacements REBID
The status, timeline and source of this project. A free account opens every field.
Source: Dodge
Huntsville Water Line Replacements A. Approximately 1200 linear feet of 12 DIP water main. B. Approximately 75 linear feet of 24 bored and jacked steel casing. C. Approximately 7500 linear feet of 6 PVC water main. D. Approximately 500 linear feet of 4 PVC water main. E. 35 service connections. F. Approximately 1800 linear feet of 1 and service pipe. G. Tee and valve assemblies. H. Connections to
- Status
- Closed
- Sector
- Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Steel, Government, Metal
- Location
- Fayetteville, Tennessee, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge
ConstructChat
Ask ConstructChat about Lincoln Co - Huntsville Hwy Water Line Replacements REBID
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Huntsville Water Line Replacements A. Approximately 1200 linear feet of 12 DIP water main. B. Approximately 75 linear feet of 24 bored and jacked steel casing. C. Approximately 7500 linear feet of 6 PVC water main. D. Approximately 500 linear feet of 4 PVC water main. E. 35 service connections. F. Approximately 1800 linear feet of 1 and service pipe. G. Tee and valve assemblies. H. Connections to existing mains. I. Other appurtenances required for a complete, functional system. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Tennessee |
City | Fayetteville |
Source
Source | Dodge |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Waste Processing and Treatment, Commercial, Road, Steel, Government, Metal |
Article published date | 2025-08-25 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
