Lincoln Road Sidewalks
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
Sidewalk construction and associated infrastructure including ditch excavation and site grading. The project will also include the extension of an existing culvert crossing under Lincoln Road. Total estimated length of sidewalk is 4,000 linear feet.
- Status
- Closed
- Sector
- Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial
- Location
- York, South Carolina, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Lincoln Road Sidewalks
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Sidewalk construction and associated infrastructure including ditch excavation and site grading. The project will also include the extension of an existing culvert crossing under Lincoln Road. Total estimated length of sidewalk is 4,000 linear feet. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | South Carolina |
City | York |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Car parking, Road, Waste Processing and Treatment, Automotive, Government, Commercial |
Article published date | 2024-03-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
