Lincoln Street Pavement Restoration and Sidewalk Project
Sector: Car parking • Location: California, United States of America
Source: Riverside County
Limits: 5th Street to 62nd Avenue Length: Approximately 1.78 miles District: 4 Community: Mecca
The County of Riverside Transportation Department is proposing to reconstruct approximately 1.78 miles of the existing pavement along Lincoln Street from 5th Street to 62nd Avenue and to widen Lincoln Street between 5th Street and 7th Street to construct curb, gutter, and sidewalk. Lincoln Street is c
Project Information FAQ
Project Information
Want to explore the full details? View the full report
Participants
Sponsoring Agency | Obfuscated Data |
Company | Obfuscated Data |
Status
Original status | closed |
Taiyo status | Obfuscated Data |
Taiyo last update | 00-00-0000 |
Available timestamps | 00-00-0000 |
Available timestamp type | Obfuscated Data |
Contact
Contact name | Obfuscated Data |
Phone | 0000000000 |
ObfuscatedData@email.com | |
Address | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Description
Description | Limits: 5th Street to 62nd Avenue Length: Approximately 1.78 miles District: 4 Community: Mecca The County of Riverside Transportation Department is proposing to reconstruct approximately 1.78 miles of the existing pavement along Lincoln Street from 5th Street to 62nd Avenue and to widen Lincoln Street between 5th Street and 7th Street to construct curb, gutter, and sidewalk. Lincoln Street is classified as a Secondary Highway. Lincoln Street is a 24 to 46 foot, two lane road with 60 to 100 feet of right of way. The proposed project will include: pulverizing the existing asphalt concrete pavement width and overlaying the pulverized material with Hot Mix Asphalt (HMA) base pavement and Asphalt Rubber Hot Mix (ARHM), removal of the existing asphalt concrete pavement and underlying material and reconstruct with HMA, ARHM, and cement treated soil, removal of the existing asphalt and underlying material and reconstruct with HMA, ARHM, aggregate base, and pavement geosynthetic layer. Additional improvements include: · Widening of the roadway and construction of curb, gutter, sidewalk, curb ramps, and driveway connections between 5th Street and 7th Street · Pedestrian ramp upgrades to meet current ADA standards · Relocation and adjustments of utilities · Relocation of fences · Salvage/removal and installation of signs · Striping of roadway Right-of-way on the east side of Lincoln Street between 5th Street and 7th Street was secured prior to the project design and no temporary construction easements (TCE) will be required to construct the proposed improvements. |
Original sub-sector | Obfuscated |
Original Currency | USD |
Original budget | 000000000000000 |
Procurement method | Obfuscated Data |
Budget | 000000000000000 |
Location
Region | Obfuscated |
Country | Obfuscated |
State | Obfuscated Data |
County | Obfuscated |
Location | Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data |
Source
Source reliability | High |
Data quality score | 100% |
Source | Obfuscated Data |
URL | obfuscated_data,obfuscateddata.com |
More Details
Project Type | Obfuscated Data |
Article Published Date | Obfuscated Data |
