Implementation / Construction

Lincoln Way Quick-Build Project Share this: Facebook Twitter LinkedIn SFMTA.com/LincolnQB The Lincoln Way Quick-Build Project has completed Outreach and Design phases! Our May 2023 Virtual Open House and survey engaged 568 respondents with over 800 comments gathered. A majority of respondents showed their support for proposed project elements, with a significant number calling for even more pedest

Project Information FAQ

Project Information

5 Q
The project “Lincoln Way Quick-Build Project” is an infrastructure initiative in the Car parking sector, located in San Francisco, California, United States of America. Taiyo aggregates data on it from SFMTA Projects.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

implementation / construction

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

Lincoln Way Quick-Build Project Share this: Facebook Twitter LinkedIn SFMTA.com/LincolnQB The Lincoln Way Quick-Build Project has completed Outreach and Design phases! Our May 2023 Virtual Open House and survey engaged 568 respondents with over 800 comments gathered. A majority of respondents showed their support for proposed project elements, with a significant number calling for even more pedestrian improvements than were proposed. Please click on the link below to review both comments received, and the most frequently asked questions raised by community members during the outreach phase. Lincoln Way Quick-Build Open House Comments and Frequently Asked Questions (FAQ) Design Updates & Next Steps Project staff expanded the proposed scope to include additional daylighting, painted safety zones, and crosswalks than were originally proposed. Many survey respondents requested improvements to bicycle infrastructure along Lincoln Way – however SFMTA encourages cyclists to use existing infrastructure on JFK Drive, MLK Jr. Drive, and the Great Highway. In total, the project plans to install 20 new crosswalks, 12 painted safety zones, 16 left turn safety treatments, daylighting at 30 approaches, six signal head upgrades (8’’ to 12’’) and signal retiming upgrades at 25th and 30th avenues to include leading pedestrian intervals (LPIs), increased crossing time, and all reds. On top of these pedestrian improvements, the SFMTA will be implementing transit improvements along Lincoln Way as part of the 29 Sunset Improvement project, as well as new traffic signals at Kezar Drive, 10th Avenue, and 41st Avenue and signal upgrades at Great Highway. Next up for the team is detailed design, which includes final refinements based on community input, and the preparation of work orders. Due to the proposed treatment types, a public hearing will not be required for this project. Project implementation will begin in Winter 2024. Please see Related Reports & Documents for Frequently Asked Questions and Comment Log . Project Introduction The Lincoln Way Quick-Build Project will improve comfort and safety for people walking along or crossing Lincoln Way, between Arguello Boulevard and Great Highway. Improvements will consist of quick and reversible traffic safety improvements that prioritize active transportation modes, primarily walking through safe pedestrian facilities, signal timing improvements and curb management. The final design will be guided by outreach to the Sunset community in collaboration with Supervisor Districts 4 and 7 in order to understand specific traffic safety and loading needs of the corridor. Project Timeline Public Outreach / Conceptual Design Winter 2022 Pending Public Outreach / Detailed Design Spring 2023 Pending Environmental Review & Legislation Summer 2023 Pending Implementation Winter 2024 Pending Project Status Implementation / Construction Improvements Neighborhoods Golden Gate Park Inner Sunset Outer Sunset Background Significant portions of Lincoln Way, from Great Highway to Arguello Boulevard, are on San Francisco’s High Injury Network, the 12% of city streets that account for over 68% of serious injuries and fatalities. Along the project extent, from June 2017 to July 2021, there were 24 collisions involving a pedestrian and 148 collisions overall that involved an injury. The purpose of this project is to address traffic safety issues for the most vulnerable road users along Lincoln Way between Great Highway and Arguello Boulevard. Quick-Build projects are comprised of reversible or adjustable traffic control, such as roadway and curb paint, signs, traffic signal timing modifications, and parking and loading adjustments. While quick-build projects are limited in scope, they offer the opportunity to implement safety improvements more quickly than a typical design-bid-build process. Quick-build projects are primarily implemented entirely by City crews, rather than with contractors, and include paint, signs, minor signal modifications and timing updates, plastic delineators, meter placement, concrete islands, curb ramps, and minor pavement improvements. The SFMTA’s goals for this project include the following: Implement pedestrian safety improvements on Lincoln Way Reduce number of conflicts between those who walk, bike, take transit, and drive on the corridor Build trust and connection with the Sunset community Improve traffic safety for the most vulnerable users, specifically pedestrians I mprove use of curb space for organizations and businesses Goals may be modified or further developed based on feedback gathered during public outreach and the results of analysis performed during the planning phase as the project progresses. Contact Information LincolnQB@sfmta.com

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data