LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
Sector: Car parking • Location: Lincolnton, Georgia, United States of America
Source: Georgia Department of Transportation (GDOT)
The project is a continuation of a phase I TE project in downtown Lincolnton. Phase II will link to State Route 47 along Peachtree Street as well as enhance Washington Street from Main Street to Goshen Street with cohesive pedestrain walkways, and landscaping. Design elements include the new sidewalks and replacement of deteriorating sidewalks. All sidewalks will be overlaid with a polymer modif
- Status
- Closed
- Sector
- Car parking, Chemical (Industrial), Road, Government, Automotive, Manufacturing (Industrial)
- Location
- Lincolnton, Georgia, United States of America
- Updated
- 22 Jul 2026
- Source
- Georgia Department of Transportation (GDOT)
ConstructChat
Ask ConstructChat about LINCOLNTON DOWNTOWN STREETSCAPE - PHASE II
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | complete |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project is a continuation of a phase I TE project in downtown Lincolnton. Phase II will link to State Route 47 along Peachtree Street as well as enhance Washington Street from Main Street to Goshen Street with cohesive pedestrain walkways, and landscaping. Design elements include the new sidewalks and replacement of deteriorating sidewalks. All sidewalks will be overlaid with a polymer modified cementitious coating. Brick pavers will be cut-in along edges of sidewalks and a brick joint at 25 foot intervals. Curb and gutters will be installed to the new and replaced sidewalks. Handicap ramps will be installed at street corners. The project area includes Peachtree St. between S.R. 47 and Main Street, Washington St. (U.S. 378/ S.R. 43) between Main St. and Goshen St., and Ward Street between U.S. 378/S.R. 43 and Peachtree St. 27 Easements for a total of 0.2461 acres will be required for the project; the remaining work will be done in the existing right-of-way. |
Location
Country | United States of America (USA) |
State | Georgia |
City | Lincolnton |
Source
Source reliability | High |
Source | Georgia Department of Transportation (GDOT) |
URL |
More Details
Record type | Project |
Sector | Car parking, Chemical (Industrial), Road, Government, Automotive, Manufacturing (Industrial) |
Article published date | 2024-01-08 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Car parking projects in United States of America
- FRANKLIN CO. AIRPORT DRIVES & PARKING
- SR 7 FROM FLORIDA STATE LINE TO NSR
- SIMPSON STREET/JONES AVE FM NORTHSIDE DR TO LUCKIE ST- GRTA
- CULVERT & BRIDGE CULVERT DURHAM PARK ROAD
- SR 9 @ CR 3705/AC SMITH RD
- CR 478/MOULTRIE LENOX RD @ LITTLE RVR 9 MI E OF NORMAN PARK
- I-285 FM I-75/CLAYTON THRU FULTON TO I-20/DEKALB
- NORCROSS DOWNTOWN STREETSCAPE - PHASE II
