logo
ProjectClosed

Linden Garage Paving

The status, timeline and source of this project. A free account opens every field.

Source: Dodge

New Paving at GCRC Linden Facility, approximately 2,870 square yards of parking lot milling and paving at a nominal depth of 2 . Prior to top course paving, the contractor will perform trenching / HMA basing of previously trenched out utility areas, with an approximate area of 554 square yards. No parking lot painting will be needed. 1. Trench out 6 , and base win with 4 of HMA 3 EL base course. A

Status
Closed
Sector
Government, Commercial, Power Transmission, Car parking, Automotive, Power Generation (CCGT), Manufacturing (Industrial)
Location
Linden, Michigan, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Linden Garage Paving

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Linden Garage Paving” is an infrastructure initiative in the Government sector, located in Linden, Michigan, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

New Paving at GCRC Linden Facility, approximately 2,870 square yards of parking lot milling and paving at a nominal depth of 2 . Prior to top course paving, the contractor will perform trenching / HMA basing of previously trenched out utility areas, with an approximate area of 554 square yards. No parking lot painting will be needed. 1. Trench out 6 , and base win with 4 of HMA 3 EL base course. Approximately 554 square yards of trenched in area, with approximately 135 tons of HMA 3EL. All tr...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Linden

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Government, Commercial, Power Transmission, Car parking, Automotive, Power Generation (CCGT), Manufacturing (Industrial)

Article published date

2025-08-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project