logo
ProjectPre-Design

Lindsay & Pecos Odor Control Construction

Sector: Water Supply and Storage • Location: Chandler, Arizona, United States of America

Source: Dodge

Design and construction of a chemical dosing station for odor control to serve the area between S Gilbert and S Lindsay Roads along Pecos Road. The station will include a secured eight-foot block wall, a concrete chemical containment area with protective linings, chemical storage tanks, mixers, injection pumps, electrical controls, SCADA monitoring system, and appurtenances.

Status
Prospective
Sector
Water Supply and Storage, Power Generation (CCGT), Chemical (Industrial), Road, Manufacturing (Industrial), Waste Processing and Treatment, Cement, Government, Commercial
Location
Chandler, Arizona, United States of America
Updated
19 Nov 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Lindsay & Pecos Odor Control Construction

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lindsay & Pecos Odor Control Construction” is an infrastructure initiative in the Water Supply and Storage sector, located in Chandler, Arizona, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

pre-design

Taiyo status

Prospective

Taiyo last update

2026-11-19

Contact

Not available for this record.

Description

Description

Design and construction of a chemical dosing station for odor control to serve the area between S Gilbert and S Lindsay Roads along Pecos Road. The station will include a secured eight-foot block wall, a concrete chemical containment area with protective linings, chemical storage tanks, mixers, injection pumps, electrical controls, SCADA monitoring system, and appurtenances.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Arizona

City

Chandler

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Chemical (Industrial), Road, Manufacturing (Industrial), Waste Processing and Treatment, Cement, Government, Commercial

Article published date

2025-07-07

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project