logo

Line 2 of the Athens Metro

Sector: Commercial • Location: Greece

Source: FCC Construction

Project
Closed

The project consisted of the construction of two new stations (Peristeri and Anthopouli) and a 1,380-metre long tunnel that completes the axis that communicates the centre of Athens with the municipality of Peristeri. It has a population of same 140,000 inhabitants and is located to the west of the city and considered one of the key municipalities in importance within the Province of Athens.The wo

Project Information FAQ

Project Information

3 Q
The project “Line 2 of the Athens Metro” is an infrastructure initiative in the Commercial sector, located in Greece. Taiyo aggregates data on it from FCC Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The project consisted of the construction of two new stations (Peristeri and Anthopouli) and a 1,380-metre long tunnel that completes the axis that communicates the centre of Athens with the municipality of Peristeri. It has a population of same 140,000 inhabitants and is located to the west of the city and considered one of the key municipalities in importance within the Province of Athens.The works require the construction of a 303 metre long tunnel under Panagi Tsaldari Avenue, with excavation using the New Austrian Method, the construction of an access shaft, east and west ventilation shafts the rehabilitation of the final shaft, the dismantling of a TBM that was left abandoned after the first project, the pedestrian accesses to the stations, service and street diversions and their replacement.The Peristeri Station, which is 112 metres long and 24 metres deep, has three levels corresponding to ticket offices, vestibule (including access control) and platforms. Because part of the station lies under the main street of the municipality and two buildings, it was executed by means of a cavern. This was one of the most difficult technical works because it involved a large tunnel with a 200 square metre free section, which was dubbed the "Grand Cavern". This execution was successful in both deadline and quality and did not produce any subsequent settling.Anthopouli Station is 147 metres long and 36 metres deep, with a ticket offices level and another for the platforms. The critical section in the construction of this station was the execution of one of the vestibule accesses that involved the excavation of a tunnel with a fifteen square metres free section with less than two metres of lining.The contract also includes the superstructure, 1,380 ballastless double track, together with the remodelling of the existing tracks in the Agios Antonios Station and the installation works for electricity, fire detection and protection, ventilation, lighting, public address, lifts, stairways, ticket sales and ticket offices etc.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data