logo
ProjectConstruction Documents

Line 204 Studios Texas Phase 1 - Office Building

Construction documents · Texas · Last reported Oct 2024

Source: Dodge USA

Three story office building. Square Footage: 51,393. Pre-engineered metal building, interior woodwork, millwork, Waterproofing, Insulation, Metal Roofing, Metal Wall Panels, Skylights, Doors/Frames/Hardware, Storefronts, Glass and Glazing, Overhead Doors, Acoustic Doors, Drywall and Framing, Painting, Flooring, Wall Coverings, Restroom Accessories, Specialties, Signage, Elevators, Fire Protection,

Status
Closed
Sector
Metal, Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial)
Location
Bastrop, Texas, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Line 204 Studios Texas Phase 1 - Office Building

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Line 204 Studios Texas Phase 1 - Office Building” is an infrastructure initiative in the Metal sector, located in Bastrop, Texas, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Construction Documents

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Three story office building. Square Footage: 51,393. Pre-engineered metal building, interior woodwork, millwork, Waterproofing, Insulation, Metal Roofing, Metal Wall Panels, Skylights, Doors/Frames/Hardware, Storefronts, Glass and Glazing, Overhead Doors, Acoustic Doors, Drywall and Framing, Painting, Flooring, Wall Coverings, Restroom Accessories, Specialties, Signage, Elevators, Fire Protection, Mechanical, Electrical, and Fire Alarm.

Procurement method

Budget

Location

Country

United States of America (USA)

State

Texas

City

Bastrop

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Metal, Power Generation (CCGT), Commercial, Residential, Manufacturing (Industrial)

Article published date

2024-10-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project