Line 26 Optimization Program (Bakken Expansion Project)
Sector: Oil and Gas • Location: Saskatchewan, Manitoba, Canada
Source: Industrial Info Resources
Enbridge is planning an optimization program on Line 26 of the broader Canadian Mainline, which could accommodate another 250,000 barrels per day (bpd). Line 26 runs from the North Dakota border to a terminal in Saskatchewan, before connecting to the Mainline system in Manitoba.
- Status
- Prospective
- Sector
- Oil and Gas, Manufacturing (Industrial)
- Location
- Saskatchewan, Manitoba, Canada
- Updated
- 19 Nov 2026
- Source
- Industrial Info Resources
ConstructChat
Ask ConstructChat about Line 26 Optimization Program (Bakken Expansion Project)
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | Enbridge is planning an optimization program on Line 26 of the broader Canadian Mainline, which could accommodate another 250,000 barrels per day (bpd). Line 26 runs from the North Dakota border to a terminal in Saskatchewan, before connecting to the Mainline system in Manitoba. |
Original sector | Energy |
Location
Country | Canada |
State | Saskatchewan, Manitoba |
Source
Source | Industrial Info Resources |
URL |
More Details
Record type | Project |
Sector | Oil and Gas, Manufacturing (Industrial) |
Article published date | 2026-08-10 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
