Line 5 Energy Pipeline Fix
One of 10,000+ projects Taiyo tracks in Michigan.
Source: Engineering News-Record
The project involves replacing a 4-mile segment of the Line 5 oil and gas pipeline under the Straits of Mackinac with a single 30-inch diameter pipe inside a concrete-lined tunnel. This modernization aims to enhance safety and ensure reliable energy access.
- Status
- Closed
- Sector
- Tunnel, Oil and Gas, Commercial, Cement
- Location
- Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Engineering News-Record
ConstructChat
Ask ConstructChat about Line 5 Energy Pipeline Fix
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | Awarded |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves replacing a 4-mile segment of the Line 5 oil and gas pipeline under the Straits of Mackinac with a single 30-inch diameter pipe inside a concrete-lined tunnel. This modernization aims to enhance safety and ensure reliable energy access. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Michigan |
Source
Source | Engineering News-Record |
URL |
More Details
Record type | Project |
Sector | Tunnel, Oil and Gas, Commercial, Cement |
Article published date | 2025-03-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
