logo

Line 5 of The Bucharest Metro

Sector: Commercial • Location: Romania

Source: FCC Construction

Project
Closed

This is the execution of section 1 of Line 5 of the Bucharest Metro, between the Raul Doamnei and Hasdeu stations.The project involves the renovation and improvement of the Bucharest metro network.It includes the civil works required in the execution of this section, which is 6.1 kilometres long, the construction of nine stations, together with the surface works required for returning the various

Project Information FAQ

Project Information

3 Q
The project “Line 5 of The Bucharest Metro” is an infrastructure initiative in the Commercial sector, located in Romania. Taiyo aggregates data on it from FCC Construction.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

closed

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

This is the execution of section 1 of Line 5 of the Bucharest Metro, between the Raul Doamnei and Hasdeu stations.The project involves the renovation and improvement of the Bucharest metro network.It includes the civil works required in the execution of this section, which is 6.1 kilometres long, the construction of nine stations, together with the surface works required for returning the various roadways affected by works execution to their original state.The route has two parallel tunnels of 3.8 and 4.0 kilometres and 5.7-metre inside diameter, together with a 260-metre long third tunnel that connects lines 1 and 5 at Eroilor Station, which has been executed using 6.60-metre excavation diameter EPB-type TBMs and lined with 30-cm thick voussoir rings. The total volume excavated by the TBM is approximately 260,000 cubic metres.The stations (Raul Doamnei, Brancusi, Romancierilor, Parc Drumul Taberei, Drumul Taberei 34, Favorit, Orizont, Academia Militara and Eroilor 2) are all underground, with depths of between 15 and 20 metres and on two levels with the exception of Academia Militara Station, which has three. Eroilor 2 Station has been executed with the works required for its inter-connection with the existing station that currently provides lines 1 and 3 services. The lengths of the various stations are between 125 and 380 metres, together with interior widths of 16 to 27 metres.Because of the ground characteristics, the proximity of other buildings and other existing structural elements, various treatments are proposed to improve and protect the ground, such as compensation and consolidation injections, and jet-grouting cut-off walls.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

Low

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data