logo

Line 5 Oil Pipeline Replacement Straits of Mackinac

One of 10,000+ projects Taiyo tracks in Michigan.

Source: Dodge

Project
Delayed

Replace the four-mile stretch of Line 5 that crosses the bottom of the straits where Lake Michigan and Lake Huron connect and encase it in a concrete tunnel

Status
Failure
Sector
Tunnel, Cement, Power Transmission, Oil and Gas, Chemical (Industrial), Manufacturing (Industrial), Power Generation (CCGT), Commercial
Location
Mackinaw City, Michigan, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Line 5 Oil Pipeline Replacement Straits of Mackinac

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Line 5 Oil Pipeline Replacement Straits of Mackinac” is an infrastructure initiative in the Tunnel sector, located in Mackinaw City, Michigan, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Delayed

Taiyo status

Failure

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Replace the four-mile stretch of Line 5 that crosses the bottom of the straits where Lake Michigan and Lake Huron connect and encase it in a concrete tunnel

Procurement method

Budget

Location

Country

United States of America (USA)

State

Michigan

City

Mackinaw City

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Tunnel, Cement, Power Transmission, Oil and Gas, Chemical (Industrial), Manufacturing (Industrial), Power Generation (CCGT), Commercial

Article published date

2025-01-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project