Line 5 Pipeline Replacement Project
Planned · Michigan · Last reported Dec 2025
Source: Bridge Michigan
The project involves replacing a 4-mile segment of the Line 5 pipeline that rests in the Straits of Mackinac with a segment buried in a concrete tunnel beneath the lakebed. A new alternative option under consideration is to use horizontal directional drilling to install the pipeline through a narrow borehole hundreds of feet underground instead of a concrete tunnel.
- Status
- Prospective
- Sector
- Tunnel, Cement, Bridge
- Location
- Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Bridge Michigan
ConstructChat
Ask ConstructChat about Line 5 Pipeline Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves replacing a 4-mile segment of the Line 5 pipeline that rests in the Straits of Mackinac with a segment buried in a concrete tunnel beneath the lakebed. A new alternative option under consideration is to use horizontal directional drilling to install the pipeline through a narrow borehole hundreds of feet underground instead of a concrete tunnel. |
Original sector | Energy Infrastructure |
Location
Country | United States of America (USA) |
State | Michigan |
Source
Source | Bridge Michigan |
URL |
More Details
Record type | Project |
Sector | Tunnel, Cement, Bridge |
Article published date | 2025-12-06 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
