logo
ProjectPlanned

Line 5 Pipeline Reroute Project

The owner, status and timeline of this project. A free account opens every field.

Source: E&E News by POLITICO

The project involves rerouting the Line 5 oil pipeline around the Bad River Reservation in northern Wisconsin. It includes replacing an existing section of the pipeline with approximately 41 miles of new pipeline to avoid crossing the reservation.

Status
Prospective
Sector
Oil and Gas
Location
Wisconsin, United States of America
Updated
22 Jul 2026
Source
E&E News by POLITICO

ConstructChat

Ask ConstructChat about Line 5 Pipeline Reroute Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Line 5 Pipeline Reroute Project” is an infrastructure initiative in the Oil and Gas sector, located in Wisconsin, United States. Taiyo aggregates data on it from E&E News by POLITICO.

Participants

Company

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves rerouting the Line 5 oil pipeline around the Bad River Reservation in northern Wisconsin. It includes replacing an existing section of the pipeline with approximately 41 miles of new pipeline to avoid crossing the reservation.

Original sector

Energy

Budget

Location

Country

United States of America (USA)

State

Wisconsin

Source

Source

E&E News by POLITICO

URL

More Details

Record type

Project

Sector

Oil and Gas

Article published date

2025-11-03

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project