logo
ProjectPlanned

Line 5 Pipeline Reroute Project

Planned · Wisconsin · Last reported Aug 2025

Source: Daily Reporter

A 41-mile pipeline rerouting project in northern Wisconsin to relocate a portion of the existing Line 5 pipeline around the Bad River Band reservation. The project requires federal, state, and local permits before construction can begin. Hearings are underway to contest the permits issued by the Wisconsin Department of Natural Resources.

Status
Prospective
Sector
Metal
Location
Wisconsin, United States of America
Updated
22 Jul 2026
Source
Daily Reporter

ConstructChat

Ask ConstructChat about Line 5 Pipeline Reroute Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Line 5 Pipeline Reroute Project” is an infrastructure initiative in the Metal sector, located in Wisconsin, United States. Taiyo aggregates data on it from Daily Reporter.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A 41-mile pipeline rerouting project in northern Wisconsin to relocate a portion of the existing Line 5 pipeline around the Bad River Band reservation. The project requires federal, state, and local permits before construction can begin. Hearings are underway to contest the permits issued by the Wisconsin Department of Natural Resources.

Original sector

Energy

Location

Country

United States of America (USA)

State

Wisconsin

Source

Source

Daily Reporter

URL

More Details

Record type

Project

Sector

Metal

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project