Line 5 Project
Proposed · Michigan · Last reported Nov 2025
Source: Upper Michigan's Source
The Line 5 project involves replacing the existing pipeline with a new tunnel running four miles along the Mackinac Straits, burying the line underground with a one-foot-thick concrete liner. An alternative construction method proposed by the U.S. Army Corps of Engineers involves horizontal directional drilling, which would house the pipeline in a much narrower, underground borehole, skipping the
- Status
- Prospective
- Sector
- Tunnel, Cement, Government
- Location
- Negaunee Township, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Upper Michigan's Source
ConstructChat
Ask ConstructChat about Line 5 Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency | |
Company |
Status
Original status | proposed |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Line 5 project involves replacing the existing pipeline with a new tunnel running four miles along the Mackinac Straits, burying the line underground with a one-foot-thick concrete liner. An alternative construction method proposed by the U.S. Army Corps of Engineers involves horizontal directional drilling, which would house the pipeline in a much narrower, underground borehole, skipping the tunnel project. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Michigan |
City | Negaunee Township |
Source
Source | Upper Michigan's Source |
URL |
More Details
Record type | Project |
Sector | Tunnel, Cement, Government |
Article published date | 2025-11-27 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
