Line 5 Tunnel Project
Sector: Tunnel • Location: Lansing, Michigan, United States
Source: 9&10 News
The Line 5 tunnel project involves construction activities including surface construction on an acre of wetlands and the discharge of drilling fluid into the Great Lakes. The project is under review by the Michigan Department of Environment, Great Lakes and Energy (EGLE), with permits being sought for specific aspects of the project. Public comment period is open until August 29, 2025, with virtua
- Status
- Prospective
- Sector
- Tunnel
- Location
- Lansing, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- 9&10 News
ConstructChat
Ask ConstructChat about Line 5 Tunnel Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Company |
Status
Original status | under review |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Line 5 tunnel project involves construction activities including surface construction on an acre of wetlands and the discharge of drilling fluid into the Great Lakes. The project is under review by the Michigan Department of Environment, Great Lakes and Energy (EGLE), with permits being sought for specific aspects of the project. Public comment period is open until August 29, 2025, with virtual meetings scheduled for August 12 and August 19. |
Original sector | Energy Infrastructure |
Location
Country | United States of America (USA) |
State | Michigan |
City | Lansing |
Source
Source | 9&10 News |
URL |
More Details
Record type | Project |
Sector | Tunnel |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
