Line 5 Tunnel Project
The owner, status and timeline of this project. A free account opens every field.
Source: Earthjustice
Enbridge has been authorized by Michigan's Department of Environment, Great Lakes, and Energy (EGLE) to build an oil tunnel below the Straits of Mackinac. The tunnel will house the Canadian oil pipeline for another century, transforming the Straits into an industrial construction zone for at least six years, with concerns about environmental risks and impacts on tribal sovereignty.
- Status
- Prospective
- Sector
- Manufacturing (Industrial), Oil and Gas, Tunnel
- Location
- St. Ignace, Michigan, United States of America
- Updated
- 22 Jul 2026
- Source
- Earthjustice
ConstructChat
Ask ConstructChat about Line 5 Tunnel Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | permits approved |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Enbridge has been authorized by Michigan's Department of Environment, Great Lakes, and Energy (EGLE) to build an oil tunnel below the Straits of Mackinac. The tunnel will house the Canadian oil pipeline for another century, transforming the Straits into an industrial construction zone for at least six years, with concerns about environmental risks and impacts on tribal sovereignty. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Michigan |
City | St. Ignace |
Source
Source | Earthjustice |
URL |
More Details
Record type | Project |
Sector | Manufacturing (Industrial), Oil and Gas, Tunnel |
Article published date | 2026-07-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
