logo
ProjectPlanned

Line 5 Tunnel Replacement Project

One of 10,000+ projects Taiyo tracks in Michigan.

Source: City Pulse

The project involves replacing the existing dual-pipeline infrastructure in the Straits of Mackinac with a new tunnel housing a pipeline segment buried under the lakebed. The project aims to address potential environmental risks associated with the current pipeline crossing.

Status
Prospective
Sector
Seaport, Tunnel
Location
Mackinaw City, Michigan, United States of America
Updated
22 Jul 2026
Source
City Pulse

ConstructChat

Ask ConstructChat about Line 5 Tunnel Replacement Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “Line 5 Tunnel Replacement Project” is an infrastructure initiative in the Seaport sector, located in Mackinaw City, Michigan, United States. Taiyo aggregates data on it from City Pulse.

Participants

Not available for this record.

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The project involves replacing the existing dual-pipeline infrastructure in the Straits of Mackinac with a new tunnel housing a pipeline segment buried under the lakebed. The project aims to address potential environmental risks associated with the current pipeline crossing.

Original sector

Energy

Location

Country

United States of America (USA)

State

Michigan

City

Mackinaw City

Source

Source

City Pulse

URL

More Details

Record type

Project

Sector

Seaport, Tunnel

Article published date

2026-04-04

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project