Line 5 Wisconsin Segment Relocation Project
The owner, status and timeline of this project. A free account opens every field.
Source: Isthmus
The project involves rerouting 41 miles of the Line 5 oil and gas pipeline around the boundaries of the Bad River Reservation in northern Wisconsin. This reroute is planned to replace the 12 miles of pipeline currently crossing the reservation, which Enbridge was ordered to cease using by June 16, 2026. The reroute aims to mitigate environmental risks to the Great Lakes watershed and local ecosyst
- Status
- Prospective
- Sector
- Oil and Gas
- Location
- Wisconsin, United States of America
- Updated
- 22 Jul 2026
- Source
- Isthmus
ConstructChat
Ask ConstructChat about Line 5 Wisconsin Segment Relocation Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The project involves rerouting 41 miles of the Line 5 oil and gas pipeline around the boundaries of the Bad River Reservation in northern Wisconsin. This reroute is planned to replace the 12 miles of pipeline currently crossing the reservation, which Enbridge was ordered to cease using by June 16, 2026. The reroute aims to mitigate environmental risks to the Great Lakes watershed and local ecosystems. |
Original sector | Energy |
Location
Country | United States of America (USA) |
State | Wisconsin |
Source
Source | Isthmus |
URL |
More Details
Record type | Project |
Sector | Oil and Gas |
Article published date | 2026-04-11 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
