logo

Line Locating Services IQC

Sector: Water Supply and Storage • Location: Tavares, Florida, United States of America

Source: Dodge USA

Project
Closed

For utility underground facilities which can be field marked with reasonable accuracy by using devices capable of identifying and locating the School Board s underground utility facilities within the required range of accuracy or by use of the School Board s maps and records, in accordance with all terms, conditions, and specifications listed and described in the body of these specifications, to b

Status
Closed
Sector
Water Supply and Storage, Power Generation (CCGT), Power Transmission, Government, Tunnel, Commercial
Location
Tavares, Florida, United States of America
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Line Locating Services IQC

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Line Locating Services IQC” is an infrastructure initiative in the Water Supply and Storage sector, located in Tavares, Florida, United States of America. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

For utility underground facilities which can be field marked with reasonable accuracy by using devices capable of identifying and locating the School Board s underground utility facilities within the required range of accuracy or by use of the School Board s maps and records, in accordance with all terms, conditions, and specifications listed and described in the body of these specifications, to be used as needed, by the School Board

Procurement method

Budget

Location

Country

United States of America (USA)

State

Florida

City

Tavares

Source

Source reliability

Medium

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Power Generation (CCGT), Power Transmission, Government, Tunnel, Commercial

Article published date

2023-05-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project