logo

Lingbi integrated biomass and waste-to-energy PPP Project

Sector: Raw Materials • Location: China

Source: InfraPPPWorld

Project
Project In Operation

The Lingbi Urban-rural Integration Project is the first project of its kind in China to have had its biomass treatment and waste-to-energy facilities constructed all at one time.The total investment of Lingbi Urban-rural Integration Project (Waste-to-energy) Phase I is approximate CNY250 million, and has been invested in and constructed on a BOO (Build-Operate-Own) basis for a concession of 30 yea

Project Information FAQ

Project Information

4 Q
The project “Lingbi integrated biomass and waste-to-energy PPP Project” is an infrastructure initiative in the Raw Materials sector, located in China. Taiyo aggregates data on it from InfraPPPWorld.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

project in operation

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

The Lingbi Urban-rural Integration Project is the first project of its kind in China to have had its biomass treatment and waste-to-energy facilities constructed all at one time.The total investment of Lingbi Urban-rural Integration Project (Waste-to-energy) Phase I is approximate CNY250 million, and has been invested in and constructed on a BOO (Build-Operate-Own) basis for a concession of 30 years. It has a designed daily household waste processing capacity of 400 tonnes and its gas emissions fully comply with the Euro 2010 Standard. Meanwhile, the total investment of Lingbi Urban-rural Integration Project (Biomass) is approximate CNY320 million. It has a designed annual agricultural waste and straw processing capacity of 300,000 tonnes and is equipped with a 130 tonnes/hour (t/h) furnace and a 30MW turbine power generator. The project is expected to generate approximately 210,000,000 kWh of electricity annually.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data