Linglong One Nuclear Power Project
Sector: Power Generation (CCGT) • Location: China
Source: Evrim Ağacı
The Linglong One project is on track to be completed and operational by 2026, contributing to China's nuclear power capacity and its goal of increasing the share of nuclear energy in its overall energy mix.
- Status
- Under Construction
- Sector
- Power Generation (CCGT), Nuclear
- Location
- China
- Updated
- 22 Jul 2026
- Source
- Evrim Ağacı
ConstructChat
Ask ConstructChat about Linglong One Nuclear Power Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Under Construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Linglong One project is on track to be completed and operational by 2026, contributing to China's nuclear power capacity and its goal of increasing the share of nuclear energy in its overall energy mix. |
Original sector | Energy |
Location
Country | China |
Source
Source | Evrim Ağacı |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Nuclear |
Article published date | 2025-05-04 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Power Generation (CCGT) projects in China
- Three Gorges Dam Hydro Electric Power Plant China
- Taishan Nuclear Power Plant
- Tianwan Nuclear Power Plant Lianyungang
- Qianwan LNG No2 CCGT Dachan Island
- Yuhuan 1000MW UltraSupercritical Pressure Boilers
- Zhenan PumpedStorage Power Project
- Xiluodu Hydroelectric Power Plant
- Qingshanhu Wastewater Treatment Plant
