logo

Lingshui Project Phase II

Sector: Wind • Location: China

Source: World Bank Group

Project
Active

Lingshui Project Phase II, with an investment of approximately RMB135 million or $ 21.25 million, will be implemented based on a Build-Operate-Transfer ("BOT") model. Its concession period will end simultaneously with Lingshui Project Phase I. With a designed daily household waste processing capacity of 350 tonnes, Lingshui Project Phase II will be equipped with a 350 tonnes/day mechanical grate f

Status
Prospective
Sector
Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial
Location
China
Updated
22 Jul 2026
Source
World Bank Group

ConstructChat

Ask ConstructChat about Lingshui Project Phase II

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Lingshui Project Phase II” is an infrastructure initiative in the Wind sector, located in China. Taiyo aggregates data on it from World Bank Group.

Participants

Sponsoring Agency

Status

Original status

Active

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Lingshui Project Phase II, with an investment of approximately RMB135 million or $ 21.25 million, will be implemented based on a Build-Operate-Transfer ("BOT") model. Its concession period will end simultaneously with Lingshui Project Phase I. With a designed daily household waste processing capacity of 350 tonnes, Lingshui Project Phase II will be equipped with a 350 tonnes/day mechanical grate furnace and a 9 MW mid-temperature sub-high pressure condensing steam turbine power generator. Financial close took place on December 21, 2021. https://www.cebenvironment.com/en/media/news_content-p211221.html

Original sector

Energy

Procurement method

Budget

Location

Country

China

Source

Source

World Bank Group

URL

More Details

Record type

Project

Sector

Wind, Power Generation (CCGT), Government, Manufacturing (Industrial), Commercial

Article published date

2024-10-01

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project