Linhares Thermal Power Plant
One of 114 projects Taiyo tracks in Espirito Santo.
Source: World Bank Group
Linhares Geracao, wholly-owned subsidiary of Linhares Brasil Energia Participacoes S.A. (Fundo de Participacoes Brasil Energia, 78%; and Linhares Energia Ltda, 22%), was granted the authorization to build and operate a 204 MW-natural gas thermal power plant located in the state of Espirito Santo. The 35-year contract was signed with the regulatory agency Aneel in March 2009.
In September 2008,
- Status
- Prospective
- Sector
- Commercial, Geothermal, Natural Gas, Power Generation (CCGT), Government
- Location
- Espirito Santo, Brazil
- Updated
- 22 Jul 2026
- Source
- World Bank Group
ConstructChat
Ask ConstructChat about Linhares Thermal Power Plant
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | Active |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Linhares Geracao, wholly-owned subsidiary of Linhares Brasil Energia Participacoes S.A. (Fundo de Participacoes Brasil Energia, 78%; and Linhares Energia Ltda, 22%), was granted the authorization to build and operate a 204 MW-natural gas thermal power plant located in the state of Espirito Santo. The 35-year contract was signed with the regulatory agency Aneel in March 2009. In September 2008, Linhares Geracao took part and won a competitive bidding to guarantee power purchase agreements. The bidding criteria set by the regulatory agency ANEEL was the lowest tariff. The 15-year contract was signed in October 2008. Linhares Geracao signed agreements to sell the electricity production to 30 distribution companies of the regulated market. The sponsor committed to invest US$ 196.7 million (BRL 360 million) in the power plant. Financial closure was achieved in June 2010, when the sponsor was granted a US$ 106 million (BRL 186.6 million) loan from BNDES. Short term financing was also granted by private banks: Itau BBA and Standard Investimento. The remaining cost was set to be financed with the sponsors’ internal resources. Construction works commenced in early 2009 and were finished in December 2010. The plant started operations in January 2011. |
Original sector | Energy |
Budget |
Location
Country | Brazil |
State | Espirito Santo |
Source
Source reliability | High |
Source | World Bank Group |
URL |
More Details
Record type | Project |
Sector | Commercial, Geothermal, Natural Gas, Power Generation (CCGT), Government |
Article published date | 2023-02-20 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Commercial projects in Brazil
- Belo Monte Hydroelectric Power Plant Xingu River
- Jirau Hydroelectric Power Plant Rondnia
- The Baguari Hydro Power Plant Brazil
- Uruguaiana CCGT Power Plant Brazil
- GNA I LNGtoPower Project Rio de Janeiro Brazil
- Feijo Hybrid Wind and Solar Project Brazil
- Juba-Jauru-Maggi-Nova Mutum Transmission Line
- Potiguar Sul Transmissao de Energia
