In November 2008, the Spanish company COBRA INSTALACIONES Y SERVICIOS S.A. was awarded in a competitive bidding process the contract to build and operate 547-km of transmission lines (Ilha Solteira - Inocencia - Chapadao) located in the states of Mato Grosso do Sul and Sao Paulo.

Besides COBRA INSTALACIONES Y SERVICIOS S.A., three other companies took part in the contest: the Spanish company Cymi

Project Information FAQ

Project Information

5 Q
The project “Linhas de Transmissao do Itatim Ltda” is an infrastructure initiative in the Commercial sector, located in Mato Grosso Do Sul, Brazil. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In November 2008, the Spanish company COBRA INSTALACIONES Y SERVICIOS S.A. was awarded in a competitive bidding process the contract to build and operate 547-km of transmission lines (Ilha Solteira - Inocencia - Chapadao) located in the states of Mato Grosso do Sul and Sao Paulo. Besides COBRA INSTALACIONES Y SERVICIOS S.A., three other companies took part in the contest: the Spanish company Cymi Holding; the Spanish company ELECNOR TRANSMISSAO DE ENERGIA S.A.; and the Spanish company ISOLUX INGENIERIA S.A. The bidding criteria set by the regulatory agency ANEEL was the lowest required annual revenue. COBRA INSTALACIONES Y SERVICIOS S.A. presented the lowest offer, a total value of US$ 26.6 million (BRL 48.6 million), 18% below the ceiling set by the regulatory agency. The contract was signed in April 2009, and the sponsors created the company Linhas de Transmissao do Itatim Ltda to lead the project during the 30-year contract period. The sponsor committed to invest US$ 177.3 million (BRL 312 million) in the transmission line. Environmental clearance was awarded in August 2010. Construction works commenced in January 2010 and were concluded by October 2011. In October 2012, the Chinese company State Grid acquired seven transmission line projects that belonged to group Cobra for US$ 537.9 million (BRL 1.05 billion), besides taking the responsibility of US$ 417 million (BRL 814 million) in debt. In November 2012, the sponsor was granted a US$ 169.8 million (BRL 331.4 million) loan from state-owned bank BNDES. The company was granted the right to take part in the government program called Regime Especial de Incentivos para o Desenvolvimento da Infra-Estrutura (Reidi). Companies selected to take part in this program were given tax cuts in the acquisition of capital equipment and construction material acquired both in the domestic and international markets (this incentive represented a cost reduction of about 9.25%). In addition, the company was allowed to use accelerated depreciation methods of accounting for construction expenditures.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data