Link Transit Bus Garage
The status, timeline and source of this project. A free account opens every field.
Source: Dodge USA
This contract provides for construction of a new bus garage for electrical vehicle charging at Link Transit s Operations center in Wenatchee, WA and includes installing pre-engineered building construction, electrical infrastructure, concrete paving, asphalt paving, curbing, sidewalks, watermain, stormwater system, sewer system modifications, illumination, striping, signing and other work as descr
- Status
- Under Construction
- Sector
- Automotive, Electric Vehicles (EVs), Water Supply and Storage, Cement, Power Generation (CCGT), Road, Waste Processing and Treatment, Car parking, Commercial, Government, Steel, Manufacturing (Industrial)
- Location
- Wenatchee, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Link Transit Bus Garage
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | GC Bidding |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | This contract provides for construction of a new bus garage for electrical vehicle charging at Link Transit s Operations center in Wenatchee, WA and includes installing pre-engineered building construction, electrical infrastructure, concrete paving, asphalt paving, curbing, sidewalks, watermain, stormwater system, sewer system modifications, illumination, striping, signing and other work as described in the contract documents and Plans. |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Wenatchee |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Electric Vehicles (EVs), Water Supply and Storage, Cement, Power Generation (CCGT), Road, Waste Processing and Treatment, Car parking, Commercial, Government, Steel, Manufacturing (Industrial) |
Article published date | 2024-07-01 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
