Linka Tungsten Project
The owner, status and timeline of this project. A free account opens every field.
Source: SMH.com.au
Viking Mines has delivered a processing breakthrough at its flagship Linka project in Nevada, producing a premium tungsten concentrate from a combined gravity separation and flotation circuit. Metallurgical testwork returned a world-class concentrate grading 62.5% tungsten trioxide with a 59.8% recovery rate from an initial feed grade of 1.2%. The project aims for modular plant construction and fa
- Status
- Prospective
- Sector
- Metal
- Location
- Nevada, United States of America
- Updated
- 22 Jul 2026
- Source
- SMH.com.au
ConstructChat
Ask ConstructChat about Linka Tungsten Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Viking Mines has delivered a processing breakthrough at its flagship Linka project in Nevada, producing a premium tungsten concentrate from a combined gravity separation and flotation circuit. Metallurgical testwork returned a world-class concentrate grading 62.5% tungsten trioxide with a 59.8% recovery rate from an initial feed grade of 1.2%. The project aims for modular plant construction and faster environmental permitting with a rapid-start flowsheet strategy prioritizing low-cost physical gravity separation. |
Original sector | Mining |
Location
Country | United States of America (USA) |
State | Nevada |
Source
Source | SMH.com.au |
URL |
More Details
Record type | Project |
Sector | Metal |
Article published date | 2026-05-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
