Linn Creek Trailhead & 6th St Pedestrian Bridge
Sector: Water Supply and Storage • Location: Marshalltown, Iowa, United States of America
Source: Dodge USA
Linn Creek Trailhead, located at/near 802 S. 3rd Street, Marshalltown, Iowa 50158. Proposed improvements include demolition, earthwork and grading, concrete abutments, pre-engineered truss bridge system, water and sanitary sewer services, storm sewer, electric service and lighting, restroom structure, park structures, PCC pavement, landscaping, site restoration and associated work. Preliminary des
- Status
- Closed
- Sector
- Water Supply and Storage, Cement, Government, Mass Transit, Rail, Bridge, Commercial, Car parking, Waste Processing and Treatment, Power Generation (CCGT), Road, Automotive
- Location
- Marshalltown, Iowa, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Linn Creek Trailhead & 6th St Pedestrian Bridge
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Linn Creek Trailhead, located at/near 802 S. 3rd Street, Marshalltown, Iowa 50158. Proposed improvements include demolition, earthwork and grading, concrete abutments, pre-engineered truss bridge system, water and sanitary sewer services, storm sewer, electric service and lighting, restroom structure, park structures, PCC pavement, landscaping, site restoration and associated work. Preliminary design and cost estimate of creating a trailhead and replacing a pedestrian bridge to serve all resi... |
Procurement method | |
Budget |
Location
Country | United States of America (USA) |
State | Iowa |
City | Marshalltown |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Water Supply and Storage, Cement, Government, Mass Transit, Rail, Bridge, Commercial, Car parking, Waste Processing and Treatment, Power Generation (CCGT), Road, Automotive |
Article published date | 2024-11-18 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Water Supply and Storage projects in United States of America
- ECOLOGICAL SERV FOR WETLAND MITIGATION SITE MONITORING/PE
- OPTIMIZING DESIGN OF GDOT POST CONSTRUCTION STORMWATER
- DOWNTOWN VIDALIA STREETSCAPES @ 5 LOCS
- 35th Ave Drainage Improvements
- NE 185th St Utility Improvements Project
- Sanitary Sewer Repair - Beardslee
- North Creek Trail Section 4-Phase 2 & 3
- William and Linda Frost Center for Research and Innovation
