logo

Linyi City Salcon Water Concession

Sector: Water Supply and Storage • Location: China

Source: World Bank Group

Project
Active

In June of 2004, Slacon Bhd. unit salcon Water (HK) Ltd. was awarded a 30-year concession contract by the state-owned Linyi Municipality Water Supply Co. (LMWS) to operate the water supply system in Linyi City, Shandong Province. The project involved the supply water to Lanshan, Luo Zhuang and He Dong areas, as well as the High Tech Development Zone and the Economic Development Zone in Linyi Munic

Project Information FAQ

Project Information

4 Q
The project “Linyi City Salcon Water Concession” is an infrastructure initiative in the Water Supply and Storage sector, located in China. Taiyo aggregates data on it from World Bank Group.

Want to explore the full details? View the full report

Participants

Sponsoring Agency

Obfuscated Data

Company

Obfuscated Data

Status

Original status

active

Taiyo status

Obfuscated Data

Taiyo last update

00-00-0000

Available timestamps

00-00-0000

Available timestamp type

Obfuscated Data

Contact

Contact name

Obfuscated Data

Phone

0000000000

Email

ObfuscatedData@email.com

Address

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Description

Description

In June of 2004, Slacon Bhd. unit salcon Water (HK) Ltd. was awarded a 30-year concession contract by the state-owned Linyi Municipality Water Supply Co. (LMWS) to operate the water supply system in Linyi City, Shandong Province. The project involved the supply water to Lanshan, Luo Zhuang and He Dong areas, as well as the High Tech Development Zone and the Economic Development Zone in Linyi Municipality. Linyi City was composed of over 1 million residents, yet less than half had access to potable water by 2004. To implment the contract, Linyi Salcon Water Co. Ltd. (LWSC) was formed as the project company which was owned by Salcon Water subsidiary Salcon Linyi (HK) Ltd. (60%) and LMWS (40%). Although the agreement to form the JV had been signed in mid-2004, the project experienced delayed and did not reach financial close until November of 2005. Salcon injected US$4.4 million (RMB 36 million) into LWSC and tookover the entire operations of the water supply system in January 2006. At the time of the contract signing in June 2004, LWSC owned assets valued at US$21.7 million (RMB 180 million) and the registered capital of the company was US$7.3 million (RMB 60 million) The weighted average water tariff was US$0.17 (RMB 1.41) per cubic meter. The non-revenue water (NRW)rate for LInyi city stood at 26%, but Salcon promised a reduction to below 20%.

Original sub-sector

Obfuscated

Original Currency

USD

Original budget

000000000000000

Procurement method

Obfuscated Data

Budget

000000000000000

Location

Region

Obfuscated

Country

Obfuscated

State

Obfuscated Data

County

Obfuscated

Location

Obfuscated Data, Obfuscated data, obfuscated data, Obfuscated data

Source

Source reliability

High

Data quality score

100%

Source

Obfuscated Data

URL

obfuscated_data,obfuscateddata.com

More Details

Project Type

Obfuscated Data

Article Published Date

Obfuscated Data