logo
ProjectPlanned

Lionheart Lithium Project Phase 1 Development

Sector: Electric Vehicles (EVs) • Location: Landau and Frankfurt, Rhineland-Palatinate and Hesse, Germany

Source: Small Caps

The Lionheart lithium project in the Upper Rhine Valley brine field aims to establish a geothermal lithium extraction plant in Landau and lithium hydroxide production capabilities at a central lithium plant in Frankfurt. The project targets producing 24,000 tonnes per annum of lithium hydroxide to support the European electric vehicle market.

Status
Prospective
Sector
Electric Vehicles (EVs), Automotive, Geothermal, Government
Location
Landau and Frankfurt, Rhineland-Palatinate and Hesse, Germany
Updated
22 Jul 2026
Source
Small Caps

ConstructChat

Ask ConstructChat about Lionheart Lithium Project Phase 1 Development

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

5 Q
The project “Lionheart Lithium Project Phase 1 Development” is an infrastructure initiative in the Electric Vehicles (EVs) sector, located in Landau and Frankfurt, Rhineland-Palatinate and Hesse, Germany. Taiyo aggregates data on it from Small Caps.

Participants

Sponsoring Agency

Status

Original status

planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Lionheart lithium project in the Upper Rhine Valley brine field aims to establish a geothermal lithium extraction plant in Landau and lithium hydroxide production capabilities at a central lithium plant in Frankfurt. The project targets producing 24,000 tonnes per annum of lithium hydroxide to support the European electric vehicle market.

Original sector

Mining & Resources

Budget

Location

Country

Germany

State

Rhineland-Palatinate and Hesse

City

Landau and Frankfurt

Source

Source

Small Caps

URL

More Details

Record type

Project

Sector

Electric Vehicles (EVs), Automotive, Geothermal, Government

Article published date

2025-09-16

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project