logo
ProjectUnder Construction

Lionheart Lithium Project

Under construction · Rhineland-Palatinate · Last reported Mar 2026

Source: Australian Mining

The Lionheart lithium project is an integrated lithium and renewable energy project in Germany targeting production of 24,000 tonnes per annum of lithium hydroxide monohydrate, along with generating renewable power and heat for local consumers. The project has secured its first lithium production licence and is under construction with plans for commercial production starting in 2028.

Status
Under Construction
Sector
Geothermal, Power Generation (CCGT), Commercial
Location
Rhineland-Palatinate, Germany
Updated
22 Jul 2026
Source
Australian Mining

ConstructChat

Ask ConstructChat about Lionheart Lithium Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lionheart Lithium Project” is an infrastructure initiative in the Geothermal sector, located in Rhineland-Palatinate, Germany. Taiyo aggregates data on it from Australian Mining.

Participants

Not available for this record.

Status

Original status

under construction

Taiyo status

Under Construction

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Lionheart lithium project is an integrated lithium and renewable energy project in Germany targeting production of 24,000 tonnes per annum of lithium hydroxide monohydrate, along with generating renewable power and heat for local consumers. The project has secured its first lithium production licence and is under construction with plans for commercial production starting in 2028.

Original sector

Mining

Budget

Location

Country

Germany

State

Rhineland-Palatinate

Source

Source

Australian Mining

URL

More Details

Record type

Project

Sector

Geothermal, Power Generation (CCGT), Commercial

Article published date

2026-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project