Lionheart Project
The owner, status and timeline of this project. A free account opens every field.
Source: The Motley Fool Australia
The Lionheart Project is an integrated lithium and renewable energy project located in the Upper Rhine Valley Brine Field between Germany and France. It targets production capacity of 24,000 tonnes of lithium hydroxide monohydrate per year, enough for around 500,000 electric vehicle batteries. The project also aims to deliver 275 GWh of renewable power and 560 GWh of heat annually for local consum
- Status
- Under Construction
- Sector
- Energy Storage, Power Generation (CCGT), Electric Vehicles (EVs), Government, Manufacturing (Industrial), Commercial, Automotive
- Location
- Germany
- Updated
- 22 Jul 2026
- Source
- The Motley Fool Australia
ConstructChat
Ask ConstructChat about Lionheart Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | under construction |
Taiyo status | Under Construction |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Lionheart Project is an integrated lithium and renewable energy project located in the Upper Rhine Valley Brine Field between Germany and France. It targets production capacity of 24,000 tonnes of lithium hydroxide monohydrate per year, enough for around 500,000 electric vehicle batteries. The project also aims to deliver 275 GWh of renewable power and 560 GWh of heat annually for local consumers over an estimated 30-year project life. The project has achieved financial close as part of a EUR2.2 billion equity and debt financing package to fund its construction. |
Original sector | Energy |
Budget |
Location
Country | Germany |
Source
Source | The Motley Fool Australia |
URL |
More Details
Record type | Project |
Sector | Energy Storage, Power Generation (CCGT), Electric Vehicles (EVs), Government, Manufacturing (Industrial), Commercial, Automotive |
Article published date | 2026-05-30 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
