LionLink Interconnector
Planned · Suffolk · Last reported Feb 2025
Source: OffshoreWIND.biz
The LionLink interconnector is a subsea cable that will connect the Nederwiek 3 offshore wind farm in the Netherlands to the UK grid, facilitating the interconnection of the two national power networks. It is planned to make landfall in Walberswick, chosen for its shorter onshore cable route and lower environmental impact.
- Status
- Prospective
- Sector
- Power Generation (CCGT), Road, Raw Materials, Wind
- Location
- Suffolk, United Kingdom
- Updated
- 22 Jul 2026
- Source
- OffshoreWIND.biz
ConstructChat
Ask ConstructChat about LionLink Interconnector
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | Planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The LionLink interconnector is a subsea cable that will connect the Nederwiek 3 offshore wind farm in the Netherlands to the UK grid, facilitating the interconnection of the two national power networks. It is planned to make landfall in Walberswick, chosen for its shorter onshore cable route and lower environmental impact. |
Original sector | Energy |
Location
Country | United Kingdom (UK) |
State | Suffolk |
Source
Source | OffshoreWIND.biz |
URL |
More Details
Record type | Project |
Sector | Power Generation (CCGT), Road, Raw Materials, Wind |
Article published date | 2025-02-28 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
