logo

Lions Creek Trail West Gap Closure Kern - Day

Pre-design · California · Last reported Apr 2025

Source: Dodge

Project
Pre-Design

This project would construct a Class I, multi-use trail approximately 4,500 linear feet in length from Santa Teresa Boulevard/Day Road to Kern Avenue along Lions Creek. This trail would provide recreational usage along the creek and pedestrian access between nearby neighborhoods and Christopher High School. The scope of work would include: Asphalt concrete Class I trail (for bicycles and pedestria

Status
Prospective
Sector
Cement, Mass Transit, Government, Commercial, Road, Rail
Location
Gilroy, California, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Lions Creek Trail West Gap Closure Kern - Day

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lions Creek Trail West Gap Closure Kern - Day” is an infrastructure initiative in the Cement sector, located in Gilroy, California, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

This project would construct a Class I, multi-use trail approximately 4,500 linear feet in length from Santa Teresa Boulevard/Day Road to Kern Avenue along Lions Creek. This trail would provide recreational usage along the creek and pedestrian access between nearby neighborhoods and Christopher High School. The scope of work would include: Asphalt concrete Class I trail (for bicycles and pedestrians) ADA-compliant curb cramp at all trail entrances Concrete retaining wall

Procurement method

Budget

Location

Country

United States of America (USA)

State

California

City

Gilroy

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Cement, Mass Transit, Government, Commercial, Road, Rail

Article published date

2025-04-14

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project