Lion’s Head Drinking Water System (Water Treatment Plant and Water Distribution System) Rehabilitation and Upgrades
The status, timeline and source of this project. A free account opens every field.
Source: Infrastructure Canada
Major upgrades and replacements to the water treatment plant & Water Distribution System as many of the components are either malfunctioning and/or past their service life. This includes: Rebuild/Replacement of the two (2) filter feed pumps (10.4 L/s each) for each package, associated piping and appurtenances that are over 10 years old. Rebuild/Replacement of membrane cartridge. Upgrade of c
- Status
- Closed
- Sector
- Waste Processing and Treatment, Wind, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial)
- Location
- Ontario, Canada
- Updated
- 22 Jul 2026
- Source
- Infrastructure Canada
ConstructChat
Ask ConstructChat about Lion’s Head Drinking Water System (Water Treatment Plant and Water Distribution System) Rehabilitation and Upgrades
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | completed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Major upgrades and replacements to the water treatment plant & Water Distribution System as many of the components are either malfunctioning and/or past their service life. This includes: Rebuild/Replacement of the two (2) filter feed pumps (10.4 L/s each) for each package, associated piping and appurtenances that are over 10 years old. Rebuild/Replacement of membrane cartridge. Upgrade of chemical feed pumps (1.6 L/min) at the treated water discharge. Purchase of new chemical feed pump required for trim chlorination to mitigate leaks along distribution system. Supervisory Control and Data Acquisition (SCADA) system upgrades to integrate new process and purchase of its respective desktop workstation. Purchase of critical spare air compressor for air scrubbing of the membrane filters installed in 2005. Replace of five vertical turbine high lift pumps with Variable Frequency Drives (one rated 6.0 L/s, three pumps rated 10 L/s and last one rated 51 L/s). Replacement of three water main valves |
Original sector | Drinking Water and Wastewater |
Location
Country | Canada |
State | Ontario |
Source
Source | Infrastructure Canada |
URL |
More Details
Record type | Project |
Sector | Waste Processing and Treatment, Wind, Chemical (Industrial), Water Supply and Storage, Manufacturing (Industrial) |
Article published date | 2026-05-03 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Waste Processing and Treatment projects in Canada
- Highway Rehab -- Bridge replacement Holland Drainage Canal, Bradford-West Gwillimbury
- Highway Rehab -- Resurfacing, Culvert rehabilitation, Drainage improvements Haldimand Rd. 56 to Dunnville west limits, and east limit of Dunnville to West/Central Boundary Haldimand County
- Highway Rehab -- Culvert rehabilitation Morris Drain Culvert, Lambton County
- Kirby In-Situ Oilsands Steam Assisted Gravity Drainage Buildings
- Southeast Personal Care Home
- Stonewall Woodlands Regional Water Supply
- Wastewater Lagoon Upgrades
- Russell Lagoon Upgrade
