logo

Lion’s Head Drinking Water System (Water Treatment Plant and Water Distribution System) Rehabilitation and Upgrades

The status, timeline and source of this project. A free account opens every field.

Source: Infrastructure Canada

Project
Completed

Major upgrades and replacements to the water treatment plant & Water Distribution System as many of the components are either malfunctioning and/or past their service life. This includes: • Rebuild/Replacement of the two (2) filter feed pumps (10.4 L/s each) for each package, associated piping and appurtenances that are over 10 years old. • Rebuild/Replacement of membrane cartridge. • Upgrade of c

Status
Closed
Sector
Water Supply and Storage, Wind, Waste Processing and Treatment, Chemical (Industrial), Manufacturing (Industrial), Government
Location
Ontario, Canada
Updated
22 Jul 2026
Source
Infrastructure Canada

ConstructChat

Ask ConstructChat about Lion’s Head Drinking Water System (Water Treatment Plant and Water Distribution System) Rehabilitation and Upgrades

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lion’s Head Drinking Water System (Water Treatment Plant and Water Distribution System) Rehabilitation and Upgrades” is an infrastructure initiative in the Water Supply and Storage sector, located in Ontario, Canada. Taiyo aggregates data on it from Infrastructure Canada.

Participants

Sponsoring Agency

Status

Original status

completed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

Major upgrades and replacements to the water treatment plant & Water Distribution System as many of the components are either malfunctioning and/or past their service life. This includes: • Rebuild/Replacement of the two (2) filter feed pumps (10.4 L/s each) for each package, associated piping and appurtenances that are over 10 years old. • Rebuild/Replacement of membrane cartridge. • Upgrade of chemical feed pumps (1.6 L/min) at the treated water discharge. • Purchase of new chemical feed pump required for trim chlorination to mitigate leaks along distribution system. • Supervisory Control and Data Acquisition (SCADA) system upgrades to integrate new process and purchase of its respective desktop workstation. • Purchase of critical spare air compressor for air scrubbing of the membrane filters installed in 2005. • Replace of five vertical turbine high lift pumps with Variable Frequency Drives (one rated 6.0 L/s, three pumps rated 10 L/s and last one rated 51 L/s). • Replacement of three water main valves

Original sector

Drinking Water and Wastewater

Location

Country

Canada

State

Ontario

Source

Source

Infrastructure Canada

URL

More Details

Record type

Project

Sector

Water Supply and Storage, Wind, Waste Processing and Treatment, Chemical (Industrial), Manufacturing (Industrial), Government

Article published date

2025-10-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project