LIPR Energy Efficiency Project
Grant award · Australia · Last reported Jul 2021
Source: GrantConnect
The project is to improve the energy efficiency of the hotel to reduce our hotel’s carbon footprint and costs. The key project to achieve this is the proposed installation of heat pumps for underfloor heating.
- Status
- Prospective
- Sector
- Hotel, Government
- Location
- Australia
- Updated
- 19 Nov 2026
- Source
- GrantConnect
ConstructChat
Ask ConstructChat about LIPR Energy Efficiency Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | grant award |
Taiyo status | Prospective |
Taiyo last update | 2026-11-19 |
Contact
| Not available for this record. |
Description
Description | The project is to improve the energy efficiency of the hotel to reduce our hotel’s carbon footprint and costs. The key project to achieve this is the proposed installation of heat pumps for underfloor heating. |
Original sector | Energy Resources |
Budget |
Location
Country | Australia |
Source
Source | GrantConnect |
URL |
More Details
Record type | Project |
Sector | Hotel, Government |
Article published date | 2024-12-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Hotel projects in Australia
- Geelong Ring Road, Victoria
- Southern Expressway Duplication Project
- Port River Expressway, Adelaide
- Princes Highway Upgrade
- Great Ocean Road
- Translational Research Institute (TRI), Brisbane, Australia
- Scientia Clinical Research Facility, University of New South Wales (UNSW)
- GlaxoSmithKline Manufacturing Facility Expansion, Boronia
