logo

LITEON AI Data Center Solutions

Sector: Power Generation (CCGT) • Location: San Jose, California, United States

Source: KTVE

Project
Planned

LITEON Technology is showcasing solutions designed for the NVIDIA GB200 NVL72 and GB300 NVL72 systems at GTC 2025. These solutions include integrated power, cabinet, and liquid cooling systems that enhance data center performance and energy efficiency for AI applications.

Status
Prospective
Sector
Power Generation (CCGT), Data Center
Location
San Jose, California, United States of America
Updated
22 Jul 2026
Source
KTVE

ConstructChat

Ask ConstructChat about LITEON AI Data Center Solutions

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

3 Q
The project “LITEON AI Data Center Solutions” is an infrastructure initiative in the Power Generation (CCGT) sector, located in San Jose, California, United States. Taiyo aggregates data on it from KTVE.

Participants

Not available for this record.

Status

Original status

Planned

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

LITEON Technology is showcasing solutions designed for the NVIDIA GB200 NVL72 and GB300 NVL72 systems at GTC 2025. These solutions include integrated power, cabinet, and liquid cooling systems that enhance data center performance and energy efficiency for AI applications.

Location

Country

United States of America (USA)

State

California

City

San Jose

Source

Source

KTVE

URL

More Details

Record type

Project

Sector

Power Generation (CCGT), Data Center

Article published date

2025-03-20

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project