logo
ProjectPre-Design

Lithium Brine - Clearwater Project

Pre-design · Alberta · Last reported Jul 2024

Source: Dodge USA

A proposed extraction of lithium hydroxide and refined into lithium carbonate and/or lithium metal at the proposed site for use in batteries. The facility is projected to produce 25,850 tonnes of lithium hydroxide per year over 50-year period.

Status
Prospective
Sector
Commercial, Metal, Energy Storage, Waste Processing and Treatment, Water Supply and Storage
Location
Clearwater County, Alberta, Canada
Updated
22 Jul 2026
Source
Dodge USA

ConstructChat

Ask ConstructChat about Lithium Brine - Clearwater Project

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Lithium Brine - Clearwater Project” is an infrastructure initiative in the Commercial sector, located in Clearwater County, Alberta, Canada. Taiyo aggregates data on it from Dodge USA.

Participants

Not available for this record.

Status

Original status

Pre-Design

Taiyo status

Prospective

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

A proposed extraction of lithium hydroxide and refined into lithium carbonate and/or lithium metal at the proposed site for use in batteries. The facility is projected to produce 25,850 tonnes of lithium hydroxide per year over 50-year period.

Budget

Location

Country

Canada

State

Alberta

City

Clearwater County

Source

Source

Dodge USA

URL

More Details

Record type

Project

Sector

Commercial, Metal, Energy Storage, Waste Processing and Treatment, Water Supply and Storage

Article published date

2024-08-05

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project