logo

Little Beaver Creek Improvements

Sector: Car parking • Location: Grimes, Iowa, United States of America

Source: Dodge

Project
Closed

The Little Beaver Creek Improvements project includes regrading the east and west creek banks along approximately 1300 linear feet of Little Beaver Creek adjacent to Lion's Park. In addition to the bank regrading, a limestone outcropping stair step will be constructed south of the pedestrian bridge, on the west side of the creek. These steps will include limestone blocks, gravel subbase and permea

Status
Closed
Sector
Car parking, Commercial, Manufacturing (Industrial), Automotive, Bridge, Government
Location
Grimes, Iowa, United States of America
Updated
22 Jul 2026
Source
Dodge

ConstructChat

Ask ConstructChat about Little Beaver Creek Improvements

Pick a question to edit it, or write your own.

First answer free · no account

I am a

Project Information FAQ

Project Information

4 Q
The project “Little Beaver Creek Improvements” is an infrastructure initiative in the Car parking sector, located in Grimes, Iowa, United States of America. Taiyo aggregates data on it from Dodge.

Participants

Not available for this record.

Status

Original status

closed

Taiyo status

Closed

Taiyo last update

2026-07-22

Contact

Not available for this record.

Description

Description

The Little Beaver Creek Improvements project includes regrading the east and west creek banks along approximately 1300 linear feet of Little Beaver Creek adjacent to Lion's Park. In addition to the bank regrading, a limestone outcropping stair step will be constructed south of the pedestrian bridge, on the west side of the creek. These steps will include limestone blocks, gravel subbase and permeable membrane, along with riprap stone around the stairs. Additionally, the project will regrade a...

Procurement method

Budget

Location

Country

United States of America (USA)

State

Iowa

City

Grimes

Source

Source

Dodge

URL

More Details

Record type

Project

Sector

Car parking, Commercial, Manufacturing (Industrial), Automotive, Bridge, Government

Article published date

2025-01-13

More on this project

Research

Free account

View all details

You are reading the public part. A free account opens the rest:

  • Every detail on this project
  • News and media coverage
  • Technical research
View all details

Free account · no card · lands you back on this project