Little Creek Bridge Replacement Project
Sector: Road • Location: Union, Oregon, United States
Source: Elkhorn Media Group
The Oregon Department of Transportation will be conducting drilling for soil samples on North College Street in Union as part of the planned Little Creek Bridge Replacement Project. The drilling will inform the design of a new structure over Little Creek. The project is estimated to begin construction in July 2026 with an estimated cost of around $3,065,304.
- Status
- Prospective
- Sector
- Road, Bridge, Government
- Location
- Union, Oregon, United States of America
- Updated
- 22 Jul 2026
- Source
- Elkhorn Media Group
ConstructChat
Ask ConstructChat about Little Creek Bridge Replacement Project
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
Sponsoring Agency |
Status
Original status | planned |
Taiyo status | Prospective |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | The Oregon Department of Transportation will be conducting drilling for soil samples on North College Street in Union as part of the planned Little Creek Bridge Replacement Project. The drilling will inform the design of a new structure over Little Creek. The project is estimated to begin construction in July 2026 with an estimated cost of around $3,065,304. |
Original sector | Transportation |
Budget |
Location
Country | United States of America (USA) |
State | Oregon |
City | Union |
Source
Source | Elkhorn Media Group |
URL |
More Details
Record type | Project |
Sector | Road, Bridge, Government |
Article published date | 2025-09-16 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
