Little Quilcene River Bridge Replacement
Closed · Washington · Last reported Apr 2024
Source: Dodge USA
Little Quilcene River Bridge Replacement - The bridge is located on Center Road 0.4 miles north of the junction with Highway 101 in Quilcene. The structurally deficient bridge is load restricted for single unit vehicles. Replace current structure with a multi-span concrete slab bridge on drilled shafts.
- Status
- Closed
- Sector
- Automotive, Bridge, Cement, Road, Government, Commercial
- Location
- Quilcene, Washington, United States of America
- Updated
- 22 Jul 2026
- Source
- Dodge USA
ConstructChat
Ask ConstructChat about Little Quilcene River Bridge Replacement
Pick a question to edit it, or write your own.
First answer free · no account
Project Information FAQ
Project Information
Participants
| Not available for this record. |
Status
Original status | closed |
Taiyo status | Closed |
Taiyo last update | 2026-07-22 |
Contact
| Not available for this record. |
Description
Description | Little Quilcene River Bridge Replacement - The bridge is located on Center Road 0.4 miles north of the junction with Highway 101 in Quilcene. The structurally deficient bridge is load restricted for single unit vehicles. Replace current structure with a multi-span concrete slab bridge on drilled shafts. |
Budget |
Location
Country | United States of America (USA) |
State | Washington |
City | Quilcene |
Source
Source | Dodge USA |
URL |
More Details
Record type | Project |
Sector | Automotive, Bridge, Cement, Road, Government, Commercial |
Article published date | 2024-04-15 |
Research
Free account
View all details
You are reading the public part. A free account opens the rest:
- Every detail on this project
- News and media coverage
- Technical research
Free account · no card · lands you back on this project
More Automotive projects in United States of America
- CS 1081/GREENVILLE STREET @ CSX RAILROAD IN LAGRANGE
- CR 1332/OLD ROSWELL RD FM .20 MI W OF MANSELL RD TO PR 9517
- MIDTOWN CONNECTOR IMPROVEMENTS
- SR 83 @ SHOAL CREEK
- ATLANTA STREETCAR EAST EXTENSION FROM JACKSON ST TO IRWIN ST
- P'TREE IND BLVD PEDESTRIAN CORRIDOR IN CHAMBLEE-LCI PROJECT
- West lake sammamish parkway phase 2
- 124th avenue ne corridor
